GOOD DAY, I HAVE MOVED ON FROM THIS BLOG TO THE ONE NOTED BELOW
I HOPE TO SEE YOU THERE
THANK YOU FOR READING
The main construction in 4x2 timber for the floor with 18mm waterproof Chipboard floor. Walls are 3x2 CLS covered with 16mm weatherboard. The roof is 18mm chipboard with 3 layer torch on felt, there is also about a ton on silicone......

I was looking around the Gaugemaster stand when i seen this starter set for £100. i must have looked at it for a while, because my misses noticed. I was sitting with the boy looking at a large G-Scale thomas layout when she disappears and comes back with it, saying i should really get myself back into trains (as she puts it). So i took up the challenge.
So i have being doing modelling of a different kind, there is still a few bits to do, a paving area, decking and a fence to build, But it is starting to really take shape. One big change will be the new shed that will replace the old one in the picture. I have a rough size of 2.5m by 3.5m to play with, which is a good size.
We have a 10 foot by 12 foot shed in the garden at the top corner. So while I have been working away I have been checking to see if there is room to build a bigger shed in blockwork along the back.
When at the club last night I managed to get a bit more done on the car park. With the ground floor complete and two of the side walls on, it was time to start putting together the upper floor together.
The car park will be in the city near the station, I have decided it will be late night shopping night in the centre, so it is going to be full, as there are 200 spaces, its a lot of cars, and lots of people about.
I have started with the floor straight above the entrance to the car park and felt this would have the most light, as this is where you enter and pay to leave. I first cut away part of the ceiling ribs to allow the LED light strip to be fixing to the roof as flat as possible. The lighting strip is in Sets of three lights with each set already having a resistor attached. The back of the strip is self adhesive, but Ross informed me that when the strip gets hot it has a habit of un-attaching itself, so I added a little super glue to help keep it in place. 
The next step was to add the barriers and cars to the level. I will be adding people to this building, but as I am still moving this around and nothing is attached I will add them when I come to fix the levels in place, so they are less likely to be damaged.